Havelock Estate
Off Hillary Road, Southall
Client: Bouygues UK (for Catalyst Housing)
Contract value: £600k Phase 1, £1.2M Phase 2
Work commenced on the project during July 2017 and successfully completed March 2020.
Phase 1 Redevelopment within Havelock Estate consisting of a linked Block of 40 No Flats along with 80 Terraced Town Houses.
All Design and Development of the Electrical Services carried out by Entric Services to serve all accommodation and communal facilities. All Power, Lighting, Door Entry, Lightning Protection, TV/Satellite, AOV Systems and Electrical infrastructure carried out.
Phase 2 Redevelopment within Havelock Estate consisting of 86 Flats within 4 Blocks, and 101 No Terraced Houses of Mixed Tenure, 2 and 3 Storey.
All Design and Development of the Electrical Services carried out by Entric Services to serve all accommodation and communal facilities. All Power, Lighting, Door Entry, Lightning Protection, TV/Satellite, AOV Systems and Electrical infrastructure carried out.